Client

Year

July 2017

Structure Type

Wellhead Platform

West Desaru MOPU (Malaysia)

One of the most challenging projects we have had – capturing of gas bubbles at 80m waterdepth.

We had to rig up and fashion an apparatus to capture these bubbles and which is suitable for the operating conditions of our Mini-ROV. It was a tedious process to trap the gas bubbles but that was accomplised, and samples were captured and sent onshore for successful lab testing.

  • 3 Conductor General Visual Inspection (GVI)
  • 1 Conductor Close Visual Inspection (CVI)
  • Riser General Visual Inspection
  • Riser Close Visual Inspection of suspected breach area
  • Gas Sampling