Client

Duration

6 Months

Disciplines

Project Management
Process Engineering
Mechanical Engineering
Electrical Engineering
Weight Control
Structural Engineering

Structure Type

Jack-Up Rig

Client

Logos of Gulf Copper, Topic, and Sarost

Duration

6 Months

Disciplines

Project Management
Process Engineering
Mechanical Engineering
Electrical Engineering
Weight Control
Structural Engineering

Structure Type

Jack-Up Rig

Jawhara 5 FEED Study

Over a six month time span, Proceanic performed a FEED study on the project of converting the ENSCO 60 jack-up to the Jawhara 5 mobile offshore drilling and production rig. Scope of work included design of the process separation system, development of technical specifications for equipment, electrical and instrumentation engineering, and preliminary weight control estimates.

Especially challenging was locating and routing hazardous piping (potentially containing hydrogen sulfide) with little available space and determining requirements for simultaneous operation of drilling and production equipment.

  • Project Management
  • Process Design using HYSYS
  • Piping and Vessel Specifications
  • Electrical Load Analysis
  • Instrumentation Specifications
  • Existing Utilities Assessment
  • Vendor Contact / Coordination
  • Weight Control Procedures
  • Skid Structural Design
  • Project Document Control