Client

Class Society

Year

Jun 2018

Structure Type

Jack-Up Accommodations

JACOB JACK-UP 

A high-pressure wash was performed on the forward stbd. Leg of the L/B Jacob Living Barge. This wash removed scale and marine growth on the shell of the Jack up Leg. The high-pressure washing allowed to identify an anomaly located on the stbd. side of the leg at 28m below the water line. This anomaly appears to be a crack on the shell of the Leg.

  • GVI/CVI – Legs
  • Marine Growth Spot Cleaning
  • UT/CP Readings